Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section

Loh, Hong Yi (2017) Set Up Reduction On Sheet Metal Fabrication Company C's CNC Punching Section. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Mekanik. (Submitted)

[img]
Preview
PDF
Download (467kB) | Preview

Abstract

To stand up in today’s globalization world, manufacturers are searching for alternative to reduce production time and cost to improve operating performance. As set up time is non-value added process to customers, manufacturers want to reduce set up time in their operation as low as near to zero. Company C, a sheet metal manufacturer want to achieve the same thing. This project is aim to provide positive result or impact on reduction of set up time in Company C’s CNC Punching operation. The objective of this project is to minimize trip to get material by operator and to minimize need of re-calibrate of die during set up.

Item Type: Monograph (Project Report)
Subjects: T Technology
T Technology > TJ Mechanical engineering and machinery
Divisions: Kampus Kejuruteraan (Engineering Campus) > Pusat Pengajian Kejuruteraan Mekanikal (School of Mechanical Engineering) > Monograph
Depositing User: Mr Mohamed Yunus Mat Yusof
Date Deposited: 07 Aug 2022 06:41
Last Modified: 07 Aug 2022 06:41
URI: http://eprints.usm.my/id/eprint/53860

Actions (login required)

View Item View Item
Share