|
Items where Subject is "T Technology > TE Highway engineering. Roads and pavements > TE210-228.3 Construction details.Including foundations, maintenance, equipment"
Group by: Creators | Item Type Number of items at this level: 3. AAwam, Pusat Pengajian Kejuruteraan (2019) First Semester Examination Academic Session 2018/2019 December 2018/January 2019 EAA483 – Construction Management (Pengurusan Binaan) Duration: 2 hours (Masa: 2 jam). [Teaching Resource] (Submitted) HHossain, Quazi Sazzad (2007) Estimation Of Turning Adjustment Factors At Signalised Intersections According To Malaysian Traffic Conditions [TE228. H829 2007 f rb]. PhD thesis, Universiti Sains Malaysia. ZZainal Abidin, Nurikhwani Idayu (2007) Evaluating Signalized Intersection Capacity Based On Malaysian Road Conditions [TE228. N974 2007 f rb]. Masters thesis, Universiti Sains Malaysia. |