Improving Inventory Turnover In A Fiber Optics Manufacturing Project

Huang, Hai (2014) Improving Inventory Turnover In A Fiber Optics Manufacturing Project. Masters thesis, Universiti Sains Malaysia.

[img]
Preview
PDF
Download (748kB) | Preview

Abstract

High inventory has been one of the unstable operation factors in fiber optics manufacturing projects in VTR Penang, a contract manufacture. This case study looks into the particularly high inventory turnover days issue encountered in a newly launched fiber optics project-MI5K project in VTR. MI5K is a high mix low volume manufacturing project with 60 days inventory turnover target, however the actual performance is 82 days. The study begins with understanding the existing workflow together with the business intelligence system.

Item Type: Thesis (Masters)
Subjects: H Social Sciences > HF Commerce > HF5001-6182 Business
Divisions: Pusat Pengajian Siswazah Perniagaan (Graduate School of Business) > Thesis
Depositing User: ASM Ab Shukor Mustapa
Date Deposited: 30 May 2019 01:58
Last Modified: 30 May 2019 01:58
URI: http://eprints.usm.my/id/eprint/44443

Actions (login required)

View Item View Item
Share