Cycle Time Analysis For Photolithography Tools In Semiconductor Manufacturing Industry With Simulation Model: A Case Study

Siow, Yuen Tien (2008) Cycle Time Analysis For Photolithography Tools In Semiconductor Manufacturing Industry With Simulation Model: A Case Study. Masters thesis, Universiti Sains Malaysia.

[img]
Preview
PDF
Download (942kB) | Preview

Abstract

Perkembangan industri semikonduktor dalam bidang fabrikasi biasanya melibatkan kos pelaburan yang tinggi terutamanya dalam alatan photolithography. Perkembangan pesat dalam bidang industri semikonduktor kini telah memerangsangkan teknik untuk mengoptimumkan penggunaan mesin-mesin dengan efektif setelah membelanjakan beribu juta dalam perlaburan. Tanpa penggunaan perisian komputer yang canggih dalam analisis, adalah sukar untuk menggunakan teknik purba dalam analisis pengiraan apabila menghadapi perkembangan produk yang semakin tinggi teknologinya. Dalam kajian ini, satu model simulasi telah dibina untuk menganalisis masa mendulu dalam alatan photolithography melalui teknik yang lebih sistematik dan efektif. Model simulasi ini telah dibina berasaskan perisian computer yang memerlukan informasi yang teliti seperti mas a memproses dan juga aliran proses dalam alatan photolithography. The industry of semiconductor wafer fabrication ("fab") has invested a huge amount of capital on the manufacturing equipments particular in photolithography area which has driven the needs to re-look at the most profitable way of utilizing and operating them efficiently. Traditional industrial engineering analysis techniques through mathematical models or static models for the studies of photolithography process are simply not adequate to analyze these complex environments. In this research, a more realistic representation of photolithography tools that can give a better prediction results and a more systematic methodology for minimizing photolithography cycle time is presented. The proposed method is to reduce waiting time and increase utilization of the photolithography process, which would result in an overall equipment cycle time reduction.

Item Type: Thesis (Masters)
Subjects: T Technology > TJ Mechanical engineering and machinery > TJ1 Mechanical engineering and machinery
Divisions: Kampus Kejuruteraan (Engineering Campus) > Pusat Pengajian Kejuruteraan Mekanikal (School of Mechanical Engineering) > Thesis
Depositing User: HJ Hazwani Jamaluddin
Date Deposited: 28 Nov 2016 08:13
Last Modified: 17 Apr 2017 09:26
URI: http://eprints.usm.my/id/eprint/31210

Actions (login required)

View Item View Item
Share