A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].

Omar, Mahanim (2008) A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb]. Masters thesis, Universiti Sains Malaysia.

[img]
Preview
PDF
Download (167Kb) | Preview

    Abstract

    This thesis addresses the job shop scheduling problem (JSSP) with the objective of minimising the makespan value. Tesis ini membincangkan masalah penskedulan kerja kedaian (JSSP) dengan objektif untuk meminimumkan masa operasi.

    Item Type: Thesis (Masters)
    Subjects: T Technology > TS Manufactures > TS155-194 Production management. Operations management
    Divisions: Pusat Pengajian Sains Matematik (School of Mathematical Sciences)
    Depositing User: MHAH Hazlee Abdul Halil
    Date Deposited: 24 Apr 2009 08:56
    Last Modified: 13 Jul 2013 12:10
    URI: http://eprints.usm.my/id/eprint/9513

    Actions (login required)

    View Item
    Share