Abstract
Performance-based Contract (PBC) was applied in Indonesia national road as
new approchment to substitute traditional way as commonly used. There are issues
affect to PBC because of overloading, side friction, swampy, emergency and
disputes. By this reason, PBC was modified to Long Segment Maintenance Contract
(LSMC). Local contractors is force to construct and maintain in the same time at the
length of territorial segment by performance measurement. However, due to of
cultural changes, contractors are not realizing and optimizing their performance.