Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects

Bulba, Alfa Taras (2019) Contractor Performance And Operational Capabilities In Long Segment Maintenance Of National Road Delivery Projects. PhD thesis, Universiti Sains Malaysia.

[img]
Preview
PDF
Download (7MB) | Preview

Abstract

Performance-based Contract (PBC) was applied in Indonesia national road as new approchment to substitute traditional way as commonly used. There are issues affect to PBC because of overloading, side friction, swampy, emergency and disputes. By this reason, PBC was modified to Long Segment Maintenance Contract (LSMC). Local contractors is force to construct and maintain in the same time at the length of territorial segment by performance measurement. However, due to of cultural changes, contractors are not realizing and optimizing their performance.

Item Type: Thesis (PhD)
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE1-450 Highway engineering. Roads and pavements
Divisions: Pusat Pengajian Perumahan, Bangunan & Perancangan (School of Housing, Building & Planning) > Thesis
Depositing User: Mr Mohammad Harish Sabri
Date Deposited: 23 May 2025 03:48
Last Modified: 23 May 2025 03:48
URI: http://eprints.usm.my/id/eprint/62291

Actions (login required)

View Item View Item
Share