Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks

Bahaudin, Ahmad Yusni (2011) Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks. PhD thesis, Universiti Sains Malaysia.

[img]
Preview
PDF
Download (406kB) | Preview

Abstract

The study of project control (cost control in particular) has only received limited attention in the Malaysian construction industry. The conventional project control system is basically corrective based, where project problems may have already occurred and the company may have experienced losses. An effective project control system must be able to anticipate emerging or unforeseeable problems, a deviation from the classical project methods which are often slow where problems may already exist. Early warnings can be included as part of the project risk management theories because “problem” and “risk” are apparently related to each other. The aim of this study is to develop a preventive cost control model that can be adopted by contractors to prevent or reduce unnecessary cost overruns.

Item Type: Thesis (PhD)
Subjects: T Technology > TH Building construction > TH1-9745 Building construction
Divisions: Pusat Pengajian Perumahan, Bangunan & Perancangan (School of Housing, Building & Planning) > Thesis
Depositing User: ASM Ab Shukor Mustapa
Date Deposited: 01 Feb 2019 07:33
Last Modified: 12 Apr 2019 05:26
URI: http://eprints.usm.my/id/eprint/43194

Actions (login required)

View Item View Item
Share