Teh, Sin Yin (2016) A new revised M-Of-K Run Rules Method in X-Bar control chart for estimated parameters. Technical Report. Universiti Sains Malaysia.
Full text not available from this repository.Abstract
Good knowledge and understanding of the behaviour of the control chart with estimated process parameters is very essential to engineers. Since the run length distribution is highly right-skewed and the skewness changes with designed parameters, average run length does not provide a complete understanding about the performance of the control chart with estimated process parameters.
Item Type: | Monograph (Technical Report) |
---|---|
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28-70 Management. Industrial Management |
Divisions: | Pusat Pengajian Pengurusan (School of Management) > Monograph |
Depositing User: | Mr Erwan Roslan |
Date Deposited: | 16 Oct 2017 04:23 |
Last Modified: | 16 Oct 2017 04:23 |
URI: | http://eprints.usm.my/id/eprint/37139 |
Actions (login required)
View Item |