The integrated prediction system for geological conditions ahead of tunnel faces

S. Shirasagi, S. Shirasagi and T. Yamamoto, T. Yamamoto and Y. Mito, Y. Mito and M. Ashraf, M. Ashraf (2011) The integrated prediction system for geological conditions ahead of tunnel faces. In: “12th International Congress on Rock Mechanics” Beijing, China (16 - 21 Oktober 2011), 16 - 21 Oktober 2011, Beijing, China.

[img]
Preview
PDF
Download (325Kb) | Preview

    Abstract

    It is essential to employ the observational design and construction method to manage tunnel projects efficiently.

    Item Type: Conference or Workshop Item (Paper)
    Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA1-2040 Engineering (General). Civil engineering (General)
    Divisions: Kampus Kejuruteraan (Engineering Campus) > Pusat Pengajian Kejuruteraan Awam (School of Civil Engineering)
    Depositing User: Mr Firdaus Mohamad
    Date Deposited: 10 Apr 2012 09:13
    Last Modified: 13 Jul 2013 17:58
    URI: http://eprints.usm.my/id/eprint/25128

    Actions (login required)

    View Item
    Share