Login | Create Account
   

The integrated prediction system for geological conditions ahead of tunnel faces

S. Shirasagi, S. Shirasagi and T. Yamamoto, T. Yamamoto and Y. Mito, Y. Mito and M. Ashraf, M. Ashraf (2011) The integrated prediction system for geological conditions ahead of tunnel faces. In: “12th International Congress on Rock Mechanics” Beijing, China (16 - 21 Oktober 2011), 16 - 21 Oktober 2011, Beijing, China.

[img]
Preview
PDF - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
325Kb

Abstract

It is essential to employ the observational design and construction method to manage tunnel projects efficiently.

Item Type:Conference or Workshop Item (Paper)
Subjects:T Technology > TA Engineering (General). Civil engineering (General) > TA1-2040 Engineering (General). Civil engineering (General)
ID Code:25128
Deposited By:Mr Firdaus Mohamad
Deposited On:10 Apr 2012 09:13
Last Modified:10 Apr 2012 09:13

Repository Staff Only: item control page

Share