PPKM, Pusat Pengajian Kejuruteraan Mekanikal (2006) EPM 202(3) - SISTEM PEMBUATAN APRIL-MEI 06. [Teaching Resource]
|
PDF
Download (3MB) | Preview |
Item Type: | Teaching Resource |
---|---|
Subjects: | T Technology > T Technology (General) > T58.7-58.8 Production capacity. Manufacturing capacity |
Divisions: | Kampus Kejuruteraan (Engineering Campus) > Pusat Pengajian Kejuruteraan Mekanikal (School of Mechanical Engineering) > Exam Papers/Teaching Resources |
Depositing User: | Administrator Automasi |
Date Deposited: | 13 Aug 2008 01:58 |
Last Modified: | 17 Apr 2017 09:51 |
URI: | http://eprints.usm.my/id/eprint/1218 |
Actions (login required)
View Item |