Kamaruddin, Shahrul and Mokhtar, Mohzani and Subari, Khairanum and Othman, Zalinda (2008) Scheduling With Alternatives Machine Using Fuzzy Inference System And Genetic Algorithm. Project Report. Universiti Sains Malaysia.
Full text not available from this repository.Abstract
As the manufacturing activities in today's industries are getting more and more complex, it is required for the manufacturing company to have a good shop floor production scheduling to plan and schedule their production orders. Industri pengeluarcim kini telah berkembang pesat dan aktiviti pengeluarannya semakin kompleks, dengan itu syarikat pengeluar memerlukan jadual lantai pengeluaran (shop floor) yang terbaik untuk merancang permintaan pengeluaran (product).
Item Type: | Monograph (Project Report) |
---|---|
Subjects: | T Technology > TJ Mechanical engineering and machinery > TJ1-1570 Mechanical engineering and machinery |
Divisions: | Kampus Kejuruteraan (Engineering Campus) > Pusat Pengajian Kejuruteraan Mekanikal (School of Mechanical Engineering) |
Depositing User: | Mr Erwan Roslan |
Date Deposited: | 11 Jun 2009 06:54 |
Last Modified: | 08 Sep 2017 03:28 |
URI: | http://eprints.usm.my/id/eprint/10511 |
Actions (login required)
View Item |