Login | Create Account
   

Prediction Of On Production Of 1ndividual Operator In A Multiple Leases Reservoir.

Mohamad Ibrahim, M. N. Prediction Of On Production Of 1ndividual Operator In A Multiple Leases Reservoir. Working Paper. Universiti Sains Malaysia.

[img]
Preview
PDF - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
3365Kb

Abstract

This paper presents a commonly existing problem in a multiple leases reservoir and tries to solve it using a boundary element method approach. The developed Boundary Element Method (BEM)formulation in calculating the productivity of well or clusters of wells located arbitrarily in an irregularly shaped reservoir was employed in this study to determine the total oil production for each operator that share a single reservoir.

Item Type:Monograph (Working Paper)
Subjects:Q Science > QD Chemistry > QD1-999 Chemistry
ID Code:9182
Deposited By:ARKM Al Rashid Automasi
Deposited On:16 Apr 2009 10:48
Last Modified:16 Apr 2009 10:48

Repository Staff Only: item control page

Share